Slate slab opening: Difference between revisions

From WU Wiki
Jump to navigation Jump to search
wurmpedia->Ulviirala
m same as below
wurmpedia->Faetyl
No edit summary
Line 8: Line 8:
|passive=[[floor plan]]
|passive=[[floor plan]]
|group=Slate slab opening
|group=Slate slab opening
|materials=
|materials=*?x [[Concrete]]
*?x [[Slate shingle]]
|result=* 1 '''{{PAGENAME}}'''
|result=* 1 '''{{PAGENAME}}'''
|skill=paving}}
|skill=paving}}

Revision as of 16:40, 29 September 2013

Main / Skills / Masonry / Slate slab opening


This article is a stub. You can help by adding to it.

Stubs are articles that writers have begun work on, but are not yet complete enough to be considered finished articles.


Slate slab opening
A Slate slab opening
A Slate slab opening
Creation
  1. Activate
  2. Right-click floor plan
  3. Open submenu "Create > Slate slab opening"
Additional materials
Result
  • 1 Slate slab opening
Skill and improvement



Description

Floor plan to create an opening with a ladder for multi-story buildings.

Usage

  • Right click the floor of the house, select Plan > Build floor with opening above to create a floor plan
  • Right click the floor plan, select Build > Slate slab opening

Notes

  • Premium paving skill is required to start a stone slab opening. 21 is assumed, possibly higher.
  • TBC

Total materials needed

  • TBC